
Secant Wall Construction
Continuous, on-demand concrete supply for overlapping secant pile walls, shoring systems and deep excavations — batched to the rig, not the traffic.
Secant walls live and die by continuity.
Primary and secondary piles have to be cast in sequence, on time, at a consistent mix.
A single missed truck can compromise the overlap. Our volumetric approach removes the dependency on a distant batch plant entirely: concrete is produced on site, pile by pile, exactly when the rig is ready.
Continuity, pile after pile.
Match the drilling cycle exactly — no waiting on trucks, no compromised overlaps.
- No cold joints from waiting — mix on demand
- Adjust slump or design mid-shift as ground shifts
- Sustained throughput on long days and remote sites
- Only what you place — billed to 0.01 m³
- No rejected loads, no return trips
- Consistent, verifiable mix every pile
From 1–2 to 4–5 pilings a day.
On the River District project, a dependable on-site supply lifted output from one or two pilings a day to four or five — recovering a six-month schedule slip on 30 m-deep, 1 m-diameter secant pilings.
Deep excavations that can’t wait.
Secant & tangent pile walls
Overlapping walls for deep excavations.
Shoring & earth retention
Basements, shafts and cut slopes.
Water-tight cut-off walls
Continuous barriers in variable ground.
Deep foundation shafts
High-count piling on tight schedules.
Batched to the rig, not the traffic.
- Mix on demand, matched to the drilling cycle
- Adjust the mix as ground conditions change
- Sustained output through long, remote days
- No rejected or returned loads
- Consistent, verifiable mix on every pile
- Only pay for the concrete you place
Have a pour coming up?
Tell us the scope, volume and timing. Our estimating team responds with an on-site production plan built around your schedule.