
Secant Wall Construction
Continuous, on-demand concrete supply for overlapping secant pile walls, shoring systems and deep excavations, batched to the rig, not the traffic.
Secant walls live and die by continuity.
Primary and secondary piles have to be cast in sequence, on time, at a consistent mix.
A single missed truck can compromise the overlap. Our volumetric approach removes the dependency on a distant batch plant entirely: concrete is produced on site, pile by pile, exactly when the rig is ready.
Continuity, pile after pile.
Match the drilling cycle exactly. No waiting on trucks, no compromised overlaps.
- No cold joints from waiting, because we mix on demand
- Adjust slump or design mid-shift as ground shifts
- Sustained throughput on long days and remote sites
- Only what you place, billed to 0.01 m³
- No rejected loads, no return trips
- Consistent, verifiable mix every pile
From 1–2 to 4–5 pilings a day.
On the River District project, a dependable on-site supply lifted output from one or two pilings a day to four or five, recovering a six-month schedule slip on 30 m-deep, 1 m-diameter secant pilings.
Deep excavations that can’t wait.
Secant & tangent pile walls
Overlapping walls for deep excavations.
Shoring & earth retention
Basements, shafts and cut slopes.
Water-tight cut-off walls
Continuous barriers in variable ground.
Deep foundation shafts
High-count piling on tight schedules.
Batched to the rig, not the traffic.
- Mix on demand, matched to the drilling cycle
- Adjust the mix as ground conditions change
- Sustained output through long, remote days
- No rejected or returned loads
- Consistent, verifiable mix on every pile
- Only pay for the concrete you place
Have a pour coming up?
Tell us the scope, volume and timing. Our estimating team responds with an on-site production plan built around your schedule.