One of the highest pours in Metro Vancouver history
Cypress Mountain Sky Chair Pour
High-elevation chairlift foundations; volumetric mixer with helicopter-assisted delivery where barrel trucks were unfeasible.

From alpine chairlift foundations to 30-metre secant pilings, our on-site production shows up where conventional supply can’t.
One of the highest pours in Metro Vancouver history
High-elevation chairlift foundations; volumetric mixer with helicopter-assisted delivery where barrel trucks were unfeasible.
4,000+ m³
Foundation concrete for a LEED Gold-target medical facility.
7,000+ m³ · 80 m³/day
Slope-side retaining walls for a $135M school development.
5,500 m³ · 30 m deep
1 m-diameter secant pilings 30 m deep; on-site silo and stockpile turned a stalled supply into 4–5 pilings/day.
9,000+ m³ · 100+ m³/day
1 m-diameter secant piles 24–30 m deep forming the shoring walls for an apartment development; on-site volumetric production sustained over 100 m³ a day.
On-site volumetric production supports heavy-civil scopes throughout BC — bridge construction, mine-site infrastructure, penstock and hydro works, cement-treated backfill and agricultural infrastructure.
Tell us the scope, volume and timing. Our estimating team responds with an on-site production plan built around your schedule.