
CFA Drilling
On-site concrete matched to continuous flight auger production — steady head pressure, no cold joints, and no waiting on trucks.
The auger can’t wait for a truck.
Continuous flight auger piling demands an uninterrupted supply of consistent, pumpable concrete as the auger withdraws.
Any gap risks necking, cold joints or a compromised pile. Producing concrete on site, on demand means the mix is always fresh and always there — no reliance on a plant across town or a queue of barrel trucks.
Positive head pressure, every pile.
Keep concrete flowing as the auger comes up — batched to the pump, live on site.
- Continuous supply as the auger withdraws
- Consistent, verifiable mix on every pile
- Higher daily pile counts, sustained
- No cold joints or necking from gaps
- Produce exactly the volume each pile needs
- No batch-plant dependency or truck queue
High-count piling, tight tolerances.
CFA & bored cast-in-place piles
Buildings and infrastructure foundations.
Constrained & remote sites
Where a plant or pump truck can’t reach.
High daily pile counts
Sustained production, shift after shift.
Tight-tolerance schedules
On-time supply that keeps rigs turning.
Fresh, continuous, on the pump.
- Continuous supply, matched to the pump
- Consistent mix proportioned every pile
- Higher daily output, no truck gaps
- No cold joints, no necking
- Produce only the volume each pile needs
- Reach constrained and remote sites
Have a pour coming up?
Tell us the scope, volume and timing. Our estimating team responds with an on-site production plan built around your schedule.